1) Experience of High-rise Building, Residential Township, Heritage
Project, Power Project, Sub-Station ,Internal and External Electrification,
Fire System, Fire Alarm System, CCTV,PA ,FIRE Alarm System & HVAC
System.
2) All types of Panel Installation, Connection and Maintenance.
3) Cable laying, Glending Termination and Dressing of HT and LT Cable up to 400 Sqmm
4) Installed up to 1500KVA Transformers and it’s connected electrical switch gear
for power distribution system and revamping of Lighting arrester, Drop out fuse,
Jumpering G.O.D. & New D.T.C.
5) Experience in Billing and Electrical equipment installation.